
Core Scientific Expands AI Capabilities to 1.1 GW with $14B AMD Partnership
Core Scientific Doubles AI Capacity to 1.1 GW in $14B AMD Deal Core Scientific has announced a significant expansion of its AI data center capacity,

Core Scientific Doubles AI Capacity to 1.1 GW in $14B AMD Deal Core Scientific has announced a significant expansion of its AI data center capacity,

Phased energization is an effective strategy for data centers, allowing them to manage energy constraints by gradually increasing their electrical capacity. Instead of powering up

AI workloads are evolving beyond the confines of traditional data centers to span distributed terrestrial campuses, edge sites, and even low Earth orbit (LEO). This

Texas is implementing stricter regulations on AI data centers following Governor Greg Abbott’s directive aimed at ensuring that developers bear a larger portion of grid

Despite a significant surge in demand for AI infrastructure, Intel’s recent layoffs highlight that the technology workforce is not immune to corporate cutbacks. The company

As artificial intelligence (AI) infrastructure becomes more intricate, companies are reevaluating their strategies for acquiring, owning, and financing assets that operate on significantly different economic

The Department of Energy’s draft report for the 2026 National Transmission Needs Study indicates that AI data centers are becoming the leading factor driving electricity

AMD is making significant strides in the AI infrastructure competition with its latest unveiling of the Helios AI system. This new offering integrates the company’s

Data centers are complex infrastructures that convert computational power into substantial electrical loads, heat, and water requirements. They face intense scrutiny regarding their efficiency, resilience,

The European Chips Act represents a significant advancement in establishing semiconductor sovereignty, highlighting the importance of fostering local demand and innovation to maintain effective supply